| Stats for 2019 | |
| Miles sailed: | 3,288 nm |
| Longest passage: | 305 nm |
| Days spent sailing: | 56 |
| Nights at anchor: | 69 |
| Nights at sea: | 7 |
| Nights on the hard: | 0 |
| Nights in marinas: | 18 |
| Nights on a mooring ball: | 9 |
| Nights living aboard: | 104 |
| Number of crew (all, excluding Chris and Jean): | 17 |
| Number of crew (family/friends): | 7 |
| Number of anchorages: | 32 |
| Number of marinas: | 4 |
| Number of haul outs: | 1 |
How does this compare to 2018? Check it out
How does this compare to 2017? Check it out
How does this compare to 2016? Check it out
| 2019 Boat Projects |
| Clean rigging |
| Replace jib furling line |
| Sand Port berth door top |
| Replace flux gate (both functional) |
| Replace Port and SB LCD display on ST70 instruments |
| Replace SB raw water pump & clamp |
| Spring clip on outboard fuel line |
| New elasatic lines on screecher blocks |
| Replace sink faucet filter |
| Bottom paint |
| Replace SB rudder bearings |
| Rubber switch cover anchor AA560 |
| 316 stainless key circle rings for mainsail and lifelines |
| Gori prop balancing |
| Epoxy/toothpick SB head door hinge |
| Glue SB head door hinge |
| Glue rub rail on dinghy |
| Paint frame of TV mount |
| Replace anchor light fixture |
| Bow sprit glue/bolt on |
| Replace Port exhaust elbow |
| Replace Heat exchanger |
| Standing rigging, remove bolt and retension |
| Replace bowsprit lines |
| Change pesto valve on accumulator tank |
| Pressurize accumulator tank |
| Replace SB head base/macerator pump |
| Replace cover from raw water filter for port head |
| Velcro ceiling |
| New window shade screens |
| Wire loom over mast cables |
| Snaps on cockpit cushions |
| Snaps on instrument covers |
| Tension dolphin striker |
| Rig bowsprit |
No Comments