One hell of a first phase of boat work

I’m off the boat work for a few days and in Utah to watch my daughter compete for the US Biathlon trails. It is a much needed rest after a hard push on the boat work front.

Backing up…before getting to work, it was a fun time cruising with Alison and Allan from Oxnard to Mission Bay, San Diego (with stops in Cherry Cove, Avalon, and Dana point along the way), not too worry there was of course some boat work was completed along the way south. Alison wrote a beautiful post about our trip, please take a minute and give it a read: link

On to the boat work! The largest two projects were the water maker install (70 hours) and the door trim removal/install (15 hours), making up about 60% of the boat work to this point.

Work items
Add drainage holes between stern extensions and engine compartment
Add engine blower motor/ducting to SB engine to reduce diesel fumes
Add shutoff valve to deck wash
Clean both engine compartments
Clean up electrical wiring (untangle and group cables)
Decommission Little Wonder water maker
Decommission Winston and Fortune battery banks
Install CruiseRO watermaker
Install new cockpit lights
Install new battery bank
Main sail track - Remove set screws, apply loc-tite, and reinstall
Measure and order blackout shade materials
Measure and order stack pack
Organize all tools, hardware, materials, spare parts into new containers and determine storage locations
Plastic hatch trim - repair/reinforce hole/cracks with fiberglass and paint
Polish door hardware
Reform door plate
Relocate port head sea water pump
Relocate SmartShunt and Cerbo
Remove and reinstall saloon table mounting and correct locking mechanism
Remove black window paint, fill cracks with epoxy primer, install "boat armor" film
Remove bowsprit hardware and front life lines to allow for corrosion treatment and painting
Remove deck latches for repairs
Remove Xantrex inverter
Repair/reinforce cracked fiberglass in saloon seat
Replace both raw water engine intake filters
Replace both raw water thru hull hose clamps with high strength clamps (2 per engine)
Replace door rubber trim
Replace door weather stripping
Replace drinking water filter
Replace lifeline ring clips with cotter pins
Replace non-stainless bolts on alternator pulley
Replace port berth USB adapter
Replace port head hoses (all)
Replace port raw water hose between engine intake filter and thru hull
Replace saloon LED light bulbs
Replace SB head switch
Replace swim step shower hose
Rewire AC outlets
Rigging inspection
Route and rewire power cords in saloon
Safety wire inner and outer shrouds
Screecher halyard - purchase, splice, and install
Test bilge pumps
Tighten boom bolt to stop wear
Treat SB holding tank with C.P. Clean

Highlight Photos

Hours Worked

Total149
10/2/2025Safe Harbor, Shelter Island6
10/1/2025Safe Harbor, Shelter Island10.75
9/30/2025Safe Harbor, Shelter Island11.25
9/29/2025Safe Harbor, Shelter Island9.5
9/28/2025Guest Dock, Shelter Island11
9/27/2025Guest Dock, Shelter Island9
9/26/2025Guest Dock, Shelter Island12
9/25/2025Guest Dock, Shelter Island11
9/24/2025Guest Dock, Shelter Island11.5
9/23/2025Guest Dock, Shelter Island11
9/22/2025Guest Dock, Shelter Island8
9/21/2025Guest Dock, Shelter Island3
9/20/2025Mission Bay, San Diego
8
9/19/2025Mission Bay, San Diego
8
9/18/2025Mission Bay, San Diego
4
9/17/2025Dana Point0
9/16/2025Avalon, Catalina0
9/15/2025Avalon, Catalina1
9/14/2025Avalon, Catalina0
9/13/2025Cherry Cove, Catalina2
9/12/2025Cherry Cove, Catalina0
9/11/2025Cherry Cove, Catalina1
9/10/2025Cherry Cove, Catalina0
9/9/2025Oxnard5
9/8/2025Oxnard6