It was another push week, the best feeling was getting all of the hyper critical items checked off the list (and a number of non-critical ones too). Geloat repairs and fore beam corrosion treatment/painting continued in the background by the guys at Miguel Hernandez Yacht Refinishing.
| Work Items |
|---|
| Add teflon tape to boom for the outhaul and add anti-chaffing sheat for the outhaul at the boom |
| Detailed engine inspections by Pacwest |
| Fill fuel tanks and fill Jerry cans |
| Fill water tank |
| Flip outhaul line |
| Mount SmartShunt |
| Polish drinking water valve |
| Purchase kayaks and relocate one of the stantion mounting racks |
| Relocate port head sea water pump and add dam in cabinet floor to keep water leaks (changing filters) on the watermaker side |
| Remove rings and replace with cotter pins on lifelines |
| Remove rust and paint engine air filter enclusures |
| Replace anchor bolts and treat corrision with rust converting paint |
| Replace GFCI at nav station |
| Replace ground cable from SmartShunt to house battery bank bus bar |
| Replace hatch vents |
| Replace jib sheet line |
| Replace RO Membrane (failed on initial installation) |
| Replace screecher furler line |
| Replace sea water exhaust hoses and clamps on both engines |
| Replace windlass switch |
| Secure Cerbo wires |
| Steam clean stools, upholstery, and rugs |
| Test saildrive sea water intrusion sensors |
| Treat TV bracket for rust and paint black |
Highlight Photos
| Total | 48.5 |
|---|---|
| 10/10/2025 | 6.75 (travel day) |
| 10/9/2025 | 13.75 |
| 10/8/2025 | 8.75 |
| 10/7/2025 | 9 |
| 10/6/2025 | 10.25 |