Week 2 in the yard complete with more boxes checked

It was another push week, the best feeling was getting all of the hyper critical items checked off the list (and a number of non-critical ones too). Geloat repairs and fore beam corrosion treatment/painting continued in the background by the guys at Miguel Hernandez Yacht Refinishing.

Work Items
Add teflon tape to boom for the outhaul and add anti-chaffing sheat for the outhaul at the boom
Detailed engine inspections by Pacwest
Fill fuel tanks and fill Jerry cans
Fill water tank
Flip outhaul line
Mount SmartShunt
Polish drinking water valve
Purchase kayaks and relocate one of the stantion mounting racks
Relocate port head sea water pump and add dam in cabinet floor to keep water leaks (changing filters) on the watermaker side
Remove rings and replace with cotter pins on lifelines
Remove rust and paint engine air filter enclusures
Replace anchor bolts and treat corrision with rust converting paint
Replace GFCI at nav station
Replace ground cable from SmartShunt to house battery bank bus bar
Replace hatch vents
Replace jib sheet line
Replace RO Membrane (failed on initial installation)
Replace screecher furler line
Replace sea water exhaust hoses and clamps on both engines
Replace windlass switch
Secure Cerbo wires
Steam clean stools, upholstery, and rugs
Test saildrive sea water intrusion sensors
Treat TV bracket for rust and paint black

Highlight Photos

Total48.5
10/10/20256.75 (travel day)
10/9/202513.75
10/8/20258.75
10/7/20259
10/6/202510.25