It was another push week, the best feeling was getting all of the hyper critical items checked off the list (and a number of non-critical ones too). Geloat repairs and fore beam corrosion treatment/painting continued in the background by the guys at Miguel Hernandez Yacht Refinishing.
Work Items |
---|
Add teflon tape to boom for the outhaul and add anti-chaffing sheat for the outhaul at the boom |
Detailed engine inspections by Pacwest |
Fill fuel tanks and fill Jerry cans |
Fill water tank |
Flip outhaul line |
Mount SmartShunt |
Polish drinking water valve |
Purchase kayaks and relocate one of the stantion mounting racks |
Relocate port head sea water pump and add dam in cabinet floor to keep water leaks (changing filters) on the watermaker side |
Remove rings and replace with cotter pins on lifelines |
Remove rust and paint engine air filter enclusures |
Replace anchor bolts and treat corrision with rust converting paint |
Replace GFCI at nav station |
Replace ground cable from SmartShunt to house battery bank bus bar |
Replace hatch vents |
Replace jib sheet line |
Replace RO Membrane (failed on initial installation) |
Replace screecher furler line |
Replace sea water exhaust hoses and clamps on both engines |
Replace windlass switch |
Secure Cerbo wires |
Steam clean stools, upholstery, and rugs |
Test saildrive sea water intrusion sensors |
Treat TV bracket for rust and paint black |
Highlight Photos
Total | 48.5 |
---|---|
10/10/2025 | 6.75 (travel day) |
10/9/2025 | 13.75 |
10/8/2025 | 8.75 |
10/7/2025 | 9 |
10/6/2025 | 10.25 |