N241VP Build Time

DateDescriptionDaily total
9/21/2020Inventory Parts (bag level only)7
9/22/2020Inventory Parts (bag level only)3
9/28/2020Inventory/Consolidate Tail kit (all parts)5.5
9/29/2020Inventory/Consolidate Fuselage kit (all parts)10
9/30/2020Inventory/Consolidate Finishing kit / Start Firewall kit (all parts)9
10/1/2020Inventory/Consolidate Firewall kit (all parts) / Build Rudder6.5
10/2/2020Rudder9.5
10/3/2020Rear avionics tray, center console electronics6.5
10/4/2020Avionics wiring7
10/5/2020Electrical wiring and priming rudder parts7
10/6/2020Rudder9
10/7/2020Elevator8.5
10/8/2020Elevator9
10/9/2020Elevator8
10/10/2020Elevator/Wing tip light install8.5
10/11/2020Wing tip and tail cone light install7.25
10/17/2020Tail light, Trim panel carbon fiber, Elevator rib and trim tab riveting4.5
10/18/2020Elevator rib riveting/rear spar riveting, Trim tab prep 8
10/19/2020Trim tab trailing edge, folding ends. HS rear spar prep5.75
10/20/2020HS bearing, front spar9.75
10/21/2020Prime HS spars, hang wings, wing bracket/autopilot, rivet HS spars8.5
10/22/2020Debur HS ribs, Prime HS ribs, Mark HS skin holes, Assembly HS skeleton 7.75
10/23/2020Debur HS spans and HS cross, dimple HS skins, prime HS parts, countersink HS spars. Rivet Elevator ribs and spar9.25
10/24/2020Riveting Elevator (spar/counter balance/hinge)9
10/25/2020Riveting Elevator (counter balance), Flap actuator bracket, Andair bracket, Aileron trim, Alieron push tubes14.4
10/26/2020Rework Flap bracket, fabricate fuel selector bracket, install tunnel access panel, install fuel sender/fuel strainer/fuel vent fitting, flap/aileron gap fairing 16
10/27/2020Prep and riveting of HS, cleco cockpit floor, riveting flap/aileron gap fairing 13.5
10/28/2020Rivet HS skinds to front spar and rear ribs, finish riveting flap/aileron gap fairing 12.5
10/29/2020Finish riveting HS, start on VOR antenna mount for VS, prep on tail11.5
10/30/2020NAV antenna doubler mounting, prep'd VS stringers, prime wing skin, prime pitot mast, prep on tail7