Lots of boxes checked today!

I have been bouncing around a bit lately and not getting a ton of items finished. Today I was able to check off a number of items and the biggest on being the ER tank installation (ended up taking 58.5 hours). Installed the connectors for the roll trim servo. I can now properly say that the wings are just about done. The bottom skin will be riveted soon and then that check box will be complete.

Also completed today, the modification to the cockpit tunnel cover for the Control Approach peddles. Finished the pitot static hose installation and secured the pilot side cables that go forward. Tackled the final rivets in the first tail section skin. And my hanger neighbor Lee helped me put the bends in the battery tray with his massive break. I stuck around late to finishing it, well almost. I still need to paint the bottom side.